Project Description
  • 0
  • April 7, 2020

Ittehad Chemical Limited engage Asian Consulting Engineers for Design, Construction and Installation of Wastewater treatment Plant.  The waste water treatment plant have cpacity 80 m3/h with area of 1 acre.  The development works envisage provisioning of Waste Water Reception Tank, Coarse screen, Equalization tank, Primary Clarifier, Aeration tank (AT), Secondary clarifier (SC), Supernatant Tank, Chemical dosing system, Evaporation ponds, Sludge line and Sludge drying bed (SDB).

EIA includes study of evaluating the likely Socio-environmental impacts of development, taking into account inter-related socio-economic, cultural and human-health impacts, both beneficial & adverse of construction and operation of WWTP