Waste Water Treatment Plant at Ittehad Chemicals Limited

Asian Consulting Engineers PVT. -LTD successfully designed and completed construction supervision for Waste Water Treatment Plant (WWTP) at Ittehad Chemicals Limited in Phase-0I.
Now the WWTP is in the operational phase with high-quality results complying Punjab Environmental Quality Standards. In Phase II, We have proposed recycling by the installation of RO Plant. The rejection of the RO Plant will be used as Raw Material in Caustic Manufacturing.
social position

Share this post

Leave a Reply

Your email address will not be published. Required fields are marked *